Velocity String Technology

As gas wells mature, liquid loading becomes a common issue, reducing gas flow and productivity. Velocity strings—small-diameter coiled tubing (CT) installed inside existing tubing—solve this by increasing gas velocity to lift liquids out of the well.

No need to kill the well during installation or ESP replacement

Fast deployment (3–5 days) using standard coiled tubing units

Minimized formation damage, especially in low-pressure wells

Supports live-well cleanout and logging operations

Automated flow control with the KIT.KLK.M-03 system, powered by solar/wind energy

This innovative solution extends well life, reduces downtime, and supports efficient artificial lift methods, including ESP and SRP on CT—without the need to kill the well.

Typical Specs:CT OD: 2″ to 2 7/8″

Max pressure: 50 MPa (7,250 psi)